01/29/2005
This was flooring weekend for the lakeside bedroom. After getting a really good deal on some 5" plank 'engineered flooring' at Menard's and driving at least a hundred miles trying to get the right Bostich staple gun and getting a new compressor this was the event (along with the frozen water pump and supply line). Generally we think this was a good choice. The lakeside bedroom is about 12x14...this took me about 12 hours more or less and I could probably do the same thing again in about eight hours. This was a Friday night and long, long Saturday project. Linda & I went back on Sunday to do baseboard moulding which of course, we did not complete...it's all a never ending project.